• Date of implementation:2011
  • Customer:FLEXPOL sp. z o.o.
  • Location:Płock

CONSTRUCTION AND EXECUTIVE DESIGN OF THE STEEL STRUCTURES FOR TECHNOLOGICAL LINE WITH A TOTAL WEIGHT OF APPROX. 70 T FOR FLEXPOL SP. Z O.O.

Scope of works – workshop design of a shelf steel structure located in the production hall

  • Share :