EXPANSION OF THE CONSTRUCTION ELEMENTS PRODUCTION PLANT, CONTAINER IN PŁOCK WITH A PAINT SHOP AND ASSEMBLY OF CONTAINERS WITH SOCIAL AND OFFICE BACKUP. STEEL HALL WITH A TRACK CRANE AND OIL BOILER ROOM
Scope of works:
A multi-branch construction and executive design for the construction of a paint shop with an area of 600m2 and a steel frame structure with a lattice transom and foundations for the painting line with the modernization of the adjacent wall of the welding hall. Construction of a new free-standing container assembly hall with a track crane with an area of approximately 1600 m². In the front part of the hall, a two-storey office space with a boiler room with an area of approximately 500m2was designed.